Login to your account

Username *
Password *
Remember Me
August 26, 2019


 Road tunnels and technology in an operational perspective
Arild Petter Sovik, Tunntech Global News

Items filtered by date: Thursday, 11 July 2019

The Kvitsøy contract is described as the most technically challenging of the three Rogfast contracts to be announced. There will be a 20.6 km tunnel, 4.5 km of road and five new bridges on Kvitsoy, and in addition two 250 meters ventilation shafts with a diameter of ten meters drilled down to bthe main tunnel under Kvitsoy (illustration: Norconsult/ Statens vegvesen).

Published in Europe

Calender (Articles)

« July 2019 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31